Launch Equipment Vault (LEV)
Send mail to webmaster with questions or comments about this web site.
Copyright © 1999 Spaceport Systems International, L.P.
A 12' x 12' concrete building for installation of support equipment is provided on the southeast portion of the launch pad.
Within this room a clear space is provided for installation of user support equipment. This building is being enlarged during the Minotaur IV SLC-8 Modifications.
Capability
Single room with a minimum ceiling height of 8'
The southeast corner of the LEV is located 65' from the center of the exhaust duct.
Air conditioning duct for routing air from the SEB HVAC area
Comm/Data conduits from the SEB
User rack space
Two (2) 24" x 24" block-outs in the west wall of the LEV to provide access to and from the LEV services and user support equipment within the LEV.
One double door
Facility Power:
120 VAC 15 and 30 Amp
120/208 VAC 30 Amp, 3-phase
208 VAC 30 Amp single-phase
Emergency UPS power for MAT lighting
Facility ground
Lighting
Lockable door
Operational Voice System (OVS)
Single and Multi-mode fiber optics
Copper cable
Paging
Voice recording (from IPF)
Administrative telephone
Inside the LEV