SLC-8 Mod Summary

 
Webmastermailto:bob.james@calspace.com?subject=Website%20Comment

Send mail to webmaster with questions or comments about this web site.

Copyright © 1999 Spaceport Systems International, L.P.

     
Doghouse.html
      1.MAT height extension
     
Platforms.html
      2.New Platforms
     
Level_3_Door.html
      3.New door and stairs at Level 3
     
Clean_Room.html
      4.Side extensions and Clean Room at Level 5 to support Fairing Operations
     
HVAC.html
      5.HVAC to provide Class 100,000 air to the Clean Room
     
HVAC.html
      6.Conditioned air to all levels
Clean_Room.html
 
HVAC.html
     7.Support of EGSE Contingency Hoist
      
LEV_Mods.html
     8.      Enlarge the Launch Equipment Vault (LEV)
      
Transporter_Pads.html
     9.      Transporter and Turnover Fixture pads
 

There are seven major modifications required to the SLC-8 MAT, one to the Launch Equipment Vault, and the addition of transporter and breakover fixture pads to provide support for the Minotaur IV vehicle.

A summary of the MAT modifications are shown in the figure below. An eighth MAT modification is for support of EGSE Contingency Power.

Click on the button to the left of each modification to see details.

For a view of the MAT mods on in place on the south side 
Click HereMAT_View_from_Southeast.html
For a view of the MAT mods on in place on the north side 
Click HereHVAC.html