Support Equipment Building (SEB)
Send mail to webmaster with questions or comments about this web site.
Copyright © 1999 Spaceport Systems International, L.P.
Capability
Comm/Data conduits to the LEV
Air conditioning duct for routing air from the SEB HVAC area to the LEV
User rack space
Two double doors
Facility Power:
120 VAC 15 and 30 Amp
120/208 VAC 30 Amp, 3-phase
208 VAC 30 Amp single-phase
480 VAC 200 Amp 3-phase
Critical (UPS-backed) Power
5 KVA UPS
120 VAC 15 and 30 Amp
Grounds
Facility Ground
Equal potential ground for Comm
Lighting
Eyewash/Shower
Flushing water (hydrant)
Air conditioning for user SE and Comm equipment
Lockable doors
Operational Voice System (OVS)
Single and Multi-mode fiber optics
Copper cable
CCTV camera on the roof
IRIG-B timing signal
Area Warning System
Paging
Voice recording (from IPF)
Administrative telephone
SEB UPS monitor (in the LCR in the IPF)
A concrete Support Equipment Building is provided to house Spaceport communications equipment and user-provided launch support equipment. The southwest corner of this building is 128 ft north and east of the launch duct centerline
View from the northwest showing the area where the generators and HVAC trailers are parked during a mission
Inside the SEB
User Equipment not installed
Railings are for the Missile Access Tower